Example Of Project Profile


To
The Executive Director
Shine Pukur Ceramics Ltd
Sarabo, Gazipur.

Subject: Prayer for release of security deposit from 1st R/A bill to 14th R/A bill.

Dear Sir
With due respect I am pleased to inform you that I have been submitted 14 No bill from 25-09-2014 to 30-03-2015. The total amount of submitted bill up to that period is taka 3,26,61,080.00 (Taka Three Crore Twenty Six Lac Sixty One Thousand Eighty Only) but your account department has been deducted (10%) Tk. 32,66,108.00 as a security deposit for a period of six month. The security period is already over. Details of submitted bills enclosed here with.

So you are highly requested to release the above said security deposit as earlier.

Thanking You and assuring you the best of our cervices

Thanks and Regards




Md. Shamsul Alam
(Proprietor)

        


DETAILS OF SUBMITTED BILL OF SCL (FROM 1ST R/A BILL TO 14TH R/A BILL)

Bill No
Date Of Submission of Bill
Amount of Bill (TK.)
Deducted Security Amount (TK.)
1st R/A
25-09-2014
33,62,624.00
3,36,262.40
2nd R/A
18-10-2014
23,29,784.00
2,32,978.40
3rd R/A
30-10-2014
14,88,902.00
1,48,870.20
4th R/A
06-11-2014
13,38,993.00
1,33,899.30
5th R/A
20-11-2014
28,73,908.00
2,87,390.80
6th R/A
28-11-2014
19,35,202.00
1,93,520.20
7th R/A
28-11-2014
24,48,960.00
2,44,896.00
8th R/A
15-12-2014
22,14,294.00
2,21,429.40
9th R/A
31-12-2014
23,42,641.00
2,34,264.10
10th R/A
30-01-2015
32,15,000.00
3,21,500.00
11th R/A
25-01-2015
22,19,900.00
2,25,930.60
12th R/A
03-03-2015
22,90,950.00
2,29,095.00
13th R/A
04-03-2015
18,79,286.00
1,87,928.60
14th R/A
30-03-2015
26,80,630.00
2,68,063.00
Total Security deposit deducted (10%) =TK.
32,66,108.00
Taka Thirty Two Lac Sixty Six Thousand One Hundred Eight Only


To
The Project Engineer
Tarasima Apparels Ltd.
Kuitta, Mnikgonj.

Subject:    Offer for Construction of 22 No New Bathroom (Worker Toilet) at Building- “C”, 1st Floor of Tarasima Apparels Ltd.

Sl. No
Description
Quantity
Unit
Rate
Amount (Tk.)
01
5’’ Thick brick wall breaking works
550.00
SFT
15.00
8,250.00
02
10’’ Thick brick wall breaking works
900.00
SFT
20.00
18,000.00
03
Rubbish Carrying works (500’)
1500.00
CFT
10.00
15,000.00
04
Tiles Floor Breaking work
1000.00
SFT
20.00
20,000.00
05
Plastic Door Opening
06.00
PCS
500.00
3,000.00
06
5’’ (Normal) Brick Work (1:4)
2400.00
SFT
100.00
2,40,000.00
07
10’’ (Normal) Brick Work (1:4)
00.00
SFT
00.00
00.00
08
Wall Tiles Work 200mm x 300mm (RAK/AKIJ/GREAT WALL/CBC)
3100.00
SFT
100.00
3,10,000.00
09
Floor Tiles Work (Homogeneous)
(300 x 300mm) (Same Brand)
900.00
SFT
120.00
1,08,000.00
10
Supply and Fitting-Fixing Plastic Door
(RFL GOLD) (2’-6’’ x 7’-0’’/ 6’-6’’)
22.00
NO
4000.00
88,000.00
11
Supply and Fitting Fixing of Long Pan (RAK) With Foot Rest
20.00
PCS
2500.00
50,000.00
12
Supply and Fitting Fixing Plastic Lowdown (RFL) (Porcelain RAK= 3,500.00) 
20.00
PCS
1400.00
28,000.00
13
Supply and Fitting Fixing 4’’ Dia U-PVC Pipe (RFL- 3.4mm Thickness) Heavy Type
750.00
RFT
100.00
75,000.00
14
4’’ Dia U-PVC Long Trap
40.00
PCS
450.00
18,000.00
15
4’’ Dia U-PVC Tee, Elbow, Door Tee, Bend etc.
75.00
PCS
300.00
22,500.00
16
GI Pipe (Bashndhara Gold) (With Tee, Elbow, Socket ) Fitting Fixing
350.00
RFT
120.00
42,000.00

Contd. Page-02
Page-02

Sl. No
Description
Quantity
Unit
Rate
Amount (Tk.)
17
Supply and Fitting Fixing Gate Valve (Brass, S Brand) With Union Socket etc. Complete





a) ’’ Dia Gate Valve
02.00
PCS
650.00
1,300.00

b) ¾’’ Dia Gate Valve
04.00
PCS
750.00
3,000.00

c) 1’’ Dia Gate Valve
01.00
PCS
850.00
850.00

d) 1 ’’ Dia Gate Valve
02.00
PCS
1500.00
3,000.00
18
Supply and Fitting Fixing of 2’’/1 ’’ Dia U-PVC Pipe for Basin Line Including Groove Cutting
50.00
RFT
60.00
3,000.00
19
Supply and Fitting Fixing





a) Bib Cock (Nazma)
40.00
PCS
1100.00
44,000.00

b) Angle Stop Cock (Nazma)
30.00
PCS
1000.00
30,000.00

c) Mirror (16’’ x 18’’)
12.00
PCS
450.00
5,400.00

d) S.S Towel Rail
08.00
PCS
550.00
4,400.00

e) CP Gratin (S.S) 5’’
30.00
PCS
120.00
3,600.00

f) Soap Case (S.S) (Normal)
(VIP- 1200)
20.00
PCS
200.00
4,000.00

g) Paper Holder (S.S) (Normal)
(VIP- 1200)
02.00
PCS
480.00
960.00

h) Push Shower (Malaysia)
(VIP- 1800)
02.00
PCS
750.00
1,500.00

i) Soap Dispenser (SS + Glass Fiber)
(VIP- 1800)
02.00
PCS
800.00
1,600.00

j) Piller Cock (Nazma Fixed)
02.00
PCS
1500.00
3,000.00
20
Wooden Door Complete (3’-6’’ x 7’-0’’) Frame 5’’ x  2’’ and Solid Shutter use chapalish wood without polishing work and door closer
02.00
Door
18,000.00
36,000.00

Contd. Page- 03

Page-03

Sl. No
Description
Quantity
Unit
Rate
Amount (Tk.)
21
Supply and Fitting Fixing Door Closer
02.00
PCS
1500.00
3,000.00
22
French Polishing Work Complete
115.00
SFT
50.00
5,750.00
23
Plastic Painting Work Complete
1000.00
SFT
20.00
20,000.00
24
RCC Work Complete (1: 1 : 3)
150.00
CFT
230.00
34,500.00
25
Shuttering Work Complete
500.00
SFT
35.00
17,500.00
26
M.S Rod Fabrication Work (40 Grade)
300.00
KG
65.00
19,500.00
27
Supply and Fitting Fixing Combi-commode RAK (KARLA)
02.00
SET
9000.00
18,000.00
28
Supply and Fitting Fixing of Exhaust Fan (10’’)
04.00
PCS
1500.00
6,000.00
Total Tk.
13,15,610.00
Taka Thirteen Lac Fifteen Thousand Six Hundred Ten Only






Md. Shamsul Alam
(Proprietor)

No comments: