To
The Executive Director
Shine Pukur Ceramics Ltd
Sarabo, Gazipur.
Subject: Prayer for release of
security deposit from 1st R/A bill to 14th R/A bill.
Dear Sir
With due respect
I am pleased to inform you that I have been submitted 14 No bill from 25-09-2014
to 30-03-2015. The total amount of submitted bill up to that period is taka 3,26,61,080.00
(Taka Three Crore Twenty Six Lac Sixty One Thousand Eighty Only) but your
account department has been deducted (10%) Tk. 32,66,108.00 as a security
deposit for a period of six month. The security period is already over. Details
of submitted bills enclosed here with.
So you are highly
requested to release the above said security deposit as earlier.
Thanking You and
assuring you the best of our cervices
Thanks and
Regards

(Proprietor)
DETAILS
OF SUBMITTED BILL OF SCL (FROM 1ST R/A BILL TO 14TH R/A
BILL)
Bill No
|
Date Of Submission of Bill
|
Amount of Bill (TK.)
|
Deducted Security Amount (TK.)
|
1st R/A
|
25-09-2014
|
33,62,624.00
|
3,36,262.40
|
2nd R/A
|
18-10-2014
|
23,29,784.00
|
2,32,978.40
|
3rd R/A
|
30-10-2014
|
14,88,902.00
|
1,48,870.20
|
4th R/A
|
06-11-2014
|
13,38,993.00
|
1,33,899.30
|
5th R/A
|
20-11-2014
|
28,73,908.00
|
2,87,390.80
|
6th R/A
|
28-11-2014
|
19,35,202.00
|
1,93,520.20
|
7th R/A
|
28-11-2014
|
24,48,960.00
|
2,44,896.00
|
8th R/A
|
15-12-2014
|
22,14,294.00
|
2,21,429.40
|
9th R/A
|
31-12-2014
|
23,42,641.00
|
2,34,264.10
|
10th R/A
|
30-01-2015
|
32,15,000.00
|
3,21,500.00
|
11th R/A
|
25-01-2015
|
22,19,900.00
|
2,25,930.60
|
12th R/A
|
03-03-2015
|
22,90,950.00
|
2,29,095.00
|
13th R/A
|
04-03-2015
|
18,79,286.00
|
1,87,928.60
|
14th R/A
|
30-03-2015
|
26,80,630.00
|
2,68,063.00
|
Total Security deposit deducted (10%) =TK.
|
32,66,108.00
|
||
Taka Thirty Two Lac Sixty Six Thousand One Hundred Eight Only
|
To
The Project Engineer
Tarasima Apparels Ltd.
Kuitta, Mnikgonj.
Subject: Offer
for Construction of 22 No New Bathroom (Worker Toilet) at Building- “C”, 1st
Floor of Tarasima Apparels Ltd.
Sl. No
|
Description
|
Quantity
|
Unit
|
Rate
|
Amount
(Tk.)
|
01
|
5’’ Thick brick wall breaking works
|
550.00
|
SFT
|
15.00
|
8,250.00
|
02
|
10’’ Thick brick wall breaking works
|
900.00
|
SFT
|
20.00
|
18,000.00
|
03
|
Rubbish Carrying works (500’)
|
1500.00
|
CFT
|
10.00
|
15,000.00
|
04
|
Tiles Floor Breaking work
|
1000.00
|
SFT
|
20.00
|
20,000.00
|
05
|
Plastic Door Opening
|
06.00
|
PCS
|
500.00
|
3,000.00
|
06
|
5’’ (Normal) Brick Work (1:4)
|
2400.00
|
SFT
|
100.00
|
2,40,000.00
|
07
|
10’’ (Normal) Brick Work (1:4)
|
00.00
|
SFT
|
00.00
|
00.00
|
08
|
Wall Tiles Work 200mm x 300mm (RAK/AKIJ/GREAT WALL/CBC)
|
3100.00
|
SFT
|
100.00
|
3,10,000.00
|
09
|
Floor Tiles Work (Homogeneous)
(300 x 300mm) (Same Brand)
|
900.00
|
SFT
|
120.00
|
1,08,000.00
|
10
|
Supply and Fitting-Fixing Plastic Door
(RFL GOLD) (2’-6’’ x 7’-0’’/ 6’-6’’)
|
22.00
|
NO
|
4000.00
|
88,000.00
|
11
|
Supply and Fitting Fixing of Long Pan (RAK) With Foot Rest
|
20.00
|
PCS
|
2500.00
|
50,000.00
|
12
|
Supply and Fitting Fixing Plastic Lowdown (RFL) (Porcelain RAK=
3,500.00)
|
20.00
|
PCS
|
1400.00
|
28,000.00
|
13
|
Supply and Fitting Fixing 4’’ Dia U-PVC Pipe (RFL- 3.4mm
Thickness) Heavy Type
|
750.00
|
RFT
|
100.00
|
75,000.00
|
14
|
4’’ Dia U-PVC Long Trap
|
40.00
|
PCS
|
450.00
|
18,000.00
|
15
|
4’’ Dia U-PVC Tee, Elbow, Door Tee, Bend etc.
|
75.00
|
PCS
|
300.00
|
22,500.00
|
16
|
GI Pipe (Bashndhara Gold) (With Tee, Elbow, Socket ) Fitting
Fixing
|
350.00
|
RFT
|
120.00
|
42,000.00
|
Contd.
Page-02
Page-02
Sl. No
|
Description
|
Quantity
|
Unit
|
Rate
|
Amount
(Tk.)
|
17
|
Supply and Fitting Fixing Gate Valve (Brass, S Brand) With Union
Socket etc. Complete
|
|
|
|
|
|
a) ’’ Dia
Gate Valve
|
02.00
|
PCS
|
650.00
|
1,300.00
|
|
b) ¾’’ Dia Gate Valve
|
04.00
|
PCS
|
750.00
|
3,000.00
|
|
c) 1’’ Dia Gate Valve
|
01.00
|
PCS
|
850.00
|
850.00
|
|
d) 1 ’’ Dia
Gate Valve
|
02.00
|
PCS
|
1500.00
|
3,000.00
|
18
|
Supply and Fitting Fixing of 2’’/1 ’’ Dia
U-PVC Pipe for Basin Line Including Groove Cutting
|
50.00
|
RFT
|
60.00
|
3,000.00
|
19
|
Supply and Fitting Fixing
|
|
|
|
|
|
a) Bib Cock (Nazma)
|
40.00
|
PCS
|
1100.00
|
44,000.00
|
|
b) Angle Stop Cock (Nazma)
|
30.00
|
PCS
|
1000.00
|
30,000.00
|
|
c) Mirror (16’’ x 18’’)
|
12.00
|
PCS
|
450.00
|
5,400.00
|
|
d) S.S Towel Rail
|
08.00
|
PCS
|
550.00
|
4,400.00
|
|
e) CP Gratin (S.S) 5’’
|
30.00
|
PCS
|
120.00
|
3,600.00
|
|
f) Soap Case (S.S) (Normal)
(VIP- 1200)
|
20.00
|
PCS
|
200.00
|
4,000.00
|
|
g) Paper Holder (S.S) (Normal)
(VIP- 1200)
|
02.00
|
PCS
|
480.00
|
960.00
|
|
h) Push Shower (Malaysia)
(VIP- 1800)
|
02.00
|
PCS
|
750.00
|
1,500.00
|
|
i) Soap Dispenser (SS + Glass Fiber)
(VIP- 1800)
|
02.00
|
PCS
|
800.00
|
1,600.00
|
|
j) Piller Cock (Nazma Fixed)
|
02.00
|
PCS
|
1500.00
|
3,000.00
|
20
|
Wooden Door Complete (3’-6’’ x 7’-0’’) Frame 5’’ x 2’’ and
Solid Shutter use chapalish wood without polishing work and door closer
|
02.00
|
Door
|
18,000.00
|
36,000.00
|
Contd.
Page- 03
Page-03
Sl. No
|
Description
|
Quantity
|
Unit
|
Rate
|
Amount
(Tk.)
|
21
|
Supply and Fitting Fixing Door Closer
|
02.00
|
PCS
|
1500.00
|
3,000.00
|
22
|
French Polishing Work Complete
|
115.00
|
SFT
|
50.00
|
5,750.00
|
23
|
Plastic Painting Work Complete
|
1000.00
|
SFT
|
20.00
|
20,000.00
|
24
|
RCC Work Complete (1: 1 :
3)
|
150.00
|
CFT
|
230.00
|
34,500.00
|
25
|
Shuttering Work Complete
|
500.00
|
SFT
|
35.00
|
17,500.00
|
26
|
M.S Rod Fabrication Work (40 Grade)
|
300.00
|
KG
|
65.00
|
19,500.00
|
27
|
Supply and Fitting Fixing Combi-commode RAK (KARLA)
|
02.00
|
SET
|
9000.00
|
18,000.00
|
28
|
Supply and Fitting Fixing of Exhaust Fan (10’’)
|
04.00
|
PCS
|
1500.00
|
6,000.00
|
Total
Tk.
|
13,15,610.00
|
||||
Taka
Thirteen Lac Fifteen Thousand Six Hundred Ten Only
|

(Proprietor)